MedAdemBHA/mythical-agent-month

Stops AI agents from quoting 5 months for work they finish in 35 hours

装之前:没有可直接复制的命令 · 许可证 MIT · 链接可访问

第一步:这条暂时没有可执行的下一步,可先看原仓库 https://github.com/MedAdemBHA/mythical-agent-month

在 GitHub 查看 ↗链接已于 2026-11-12 核查 · HTTP 200 · 打开的是厂商自己的官网
★ 数取值
26 ★ · MedAdemBHA/mythical-agent-month · 取自 GitHub 搜索 API · (2026-11-13 20:00:50 核对)
来源明细
从该仓库的 GitHub 页面直接读取 · 条目类型:开源项目
收录与活跃
收录于 2026-11-04 · 最近见到 2026-11-14 · 共见到 11 次 · 被 1 个来源列出
评分构成
综合分 103 · 26 ★ · 1 个来源 · repo
常见问题(答案都来自我们的记录)
它适合谁 / 用来做什么?
我们把它归在这些标签下: Agent 技能。标签来自条目自身,不是我们强加的分类。
谁维护它、还在更新吗?
仓库 MedAdemBHA/mythical-agent-month;我们收录于 2026-11-04;最近见到 2026-11-14。这里没有"官方认证"或"质量评级"——我们只记录来源与时间。

# 🗿 Mythical Agent Month

以下摘录自该仓库的 README(片段) · 在 GitHub 读完整 README →

Your agent said 5 months. Agents built it in 35 hours.
An estimation skill for Claude Code, Codex, Cursor, Gemini CLI and Copilot (plus a paste-in prompt for anything else) that stops AI from quoting human-team timelines for agent-built software.
> Brooks, 1975: "Adding manpower to a late software project makes it later."
> 2026: your agent still estimates like it's 1975.
## The problem
Ask an AI "how long will this roadmap take?" and you get "3-5 months", sprint plans, story points. That's human-team pace, learned from human tickets.
We ran the real thing: a 106-task, 7-repo SaaS roadmap built by autonomous agents (worktrees, parallel lanes, tests first, reviewer agents, phase-end suites).
| | Naive AI estimate | Real run |
| Time | "about 5 months" (60-100 days) | 35.3 h agent wall-clock |
| Agent-hours | - | 64.2 |
| Usage | - | ~35-40% of a weekly limit |
| Ready to merge | - | ~3 days |
The code wasn't the slow part. Tests, review, decisions and the usage limit were.
### How accurate is the skill? Honestly:
| Test | Raw "likely" wall-clock | Plan (likely × 1.3, the bold number it prints) |
| In-sample fit: defaults measured on this run, run on its own task graph | 31.1 h vs 35.3 h real (-12%) | 40 h (+14%) |
| Held-out: fit on phases 0-3, predict phases 4-9 blind | 12.4 h vs 19.8 h real (-37%) | 16 h (-19%) |
So it gets the order of magnitude right: hours, not months. The raw model leans optimistic, so until you calibrate, the number it prints in bold is the plan (likely × 1.3), with the likely value and the range beside it. It's still n = 1: one project, one laptop, one setup. The method is in examples/holdout.md. A second, independent run is the missing evidence. Yours would help.
## What it does
It never gives one big number. It separates:
Machine time: agent wall-clock and agent-hours, using the task graph's critical path and the parallelism you really get.
Human effort: prompting, review per commit, local setup, click-through.
Waiting: decisions and usage-limit resets. They're calendar time, never effort.
Usage: the % of your weekly limit, so you know whether the run fits this week.
There are two modes:
| Mode | When | Output |
| A: Developer + AI | You drive an assistant task by task | Focus hours and days, with a calendar range |
| B: Autonomous agents | A plan split into tasks that agents build, often in parallel | Wall-clock, agent-hours, critical path, usage %, calendar to ready-to-merge |
Both modes show the no-AI pace as a comparison line only.
## Numbers from real runs, not vibes
The defaults are measured on 398 subagent runs from one real build, not hand-tuned:
| Agent kind | Median | p75 |
| Code task, high risk (big model) | 30 min | 39 min |
| Code task, normal risk | 11 min | 24 min |
| Code task, low risk (small model) | 3.5 min | 8 min |
| Reviewer agent | 8 min | 12 min |
| Merge | / /subagents --tasks tasks.json
It's read-only: it uses timestamps, labels, model names and token counts, and prints no content. You get:
收录徽章(可选)
想把收录标记放进 README 就复制这行,可选,不影响收录。
[![Listed on Anclum](https://anclum.com/badge/listed.svg)](https://anclum.com/zh/s/medadembha-mythical-agent-month/)
来源
github · https://github.com/MedAdemBHA/mythical-agent-month
按领域浏览
Agent 技能
Traction
26 ★
收录于
今天

同类推荐

全部 420 →

所属领域与标签

每个标签都能点进去看同类的全部条目。数字是当前库里的真实条数。

浏览全部领域 →

← 返回索引